Project Gallery

Real Installations. Real Power.

Every video below is a genuine AfriGrid Energy project — no stock footage, no simulations. Watch our engineers install, wire, and commission commercial solar systems across Nigeria.

9 Real Projects
Feb – Mar 2026
Multiple States, Nigeria
Commissioning
1
30 kW Hybrid

30 kW System — Live Commissioning

Deye 30 kW hybrid inverter startup, Dawnice battery handshake, and live power handover to the client. Zero diesel from day one.

Lagos, Nigeria
Mar 2026
Full Install
2
50 kW + 100 kWh

50 kW Hotel Installation — Full Walkthrough

Complete end-to-end installation for a 50-room hotel — panel mounting, inverter room build-out, battery bank, and final switchover in under 3 days.

Abuja, Nigeria
Feb 2026
Battery Storage
3
50 kWh BESS

Dawnice 50 kWh Battery Bank Assembly

Rack assembly and commissioning of a Dawnice 50 kWh BESS for a commercial facility. Includes BMS configuration and cell balancing.

Port Harcourt, Nigeria
Mar 2026
Panel Install
4
45 kWp Array

Factory Rooftop — Panel Mounting

Structural rail installation and Dawnice panel mounting on a manufacturing facility rooftop. 120 panels, 2 strings.

Ibadan, Nigeria
Mar 2026
Electrical
5
20 kW Deye

Deye Hybrid Inverter Wiring & Config

AC/DC wiring, earthing, surge protection, and Deye SolarMan app configuration for a 20 kW hybrid system.

Lagos, Nigeria
Mar 2026
Site Prep
6
80 kW Estate

Commercial Estate — Site Preparation

Pre-installation site survey, structural load assessment, shading analysis, and equipment staging for a 40-unit residential estate.

Enugu, Nigeria
Mar 2026
Electrical
7
25 kW System

DC Cable Routing & Conduit Install

Professional DC cable management — conduit runs, cable trays, and labelling for a clean, IEC-compliant installation.

Lagos, Nigeria
Mar 2026
Site Prep
8
60 kW Hospital

Hospital Rooftop Survey & Layout

Pre-installation survey for a private hospital — load-bearing check, shading map, and optimal panel layout for 24/7 critical power.

Lagos, Nigeria
Mar 2026
Commissioning
9
30 kW Hybrid

Post-Install Inspection & Handover

Final system walkthrough, performance verification, and client handover — including live monitoring dashboard setup on SolarMan.

Lagos, Nigeria
Mar 2026

Ready to be our next project?

Every installation you watched started with a single conversation. Let's talk about your facility.